Prepare VMCE2021 Question Answers Free Update With 100% Exam Passing Guarantee [Q39-Q55]

Diesen Beitrag bewerten

Prepare VMCE2021 Question Answers Free Update With 100% Exam Passing Guarantee [2023]

Dumps Real Veeam VMCE2021 Exam Questions [Updated 2023]

NO.39 A planned failover of three VMs has just completed successfully, starting the VMs at the disaster recovery location. What next actions are available for the failover plan?

 
 
 
 

NO.40 Which storage optimization option uses a block size of 512 KB?

 
 
 
 

NO.41 If the deduplication settings are changed for an existing job, when will the new settings be applied?

 
 
 
 

NO.42 What are the three Veeam Backup & Replication technologies required to verify recoverability of the backup?
(Choose three.)

 
 
 
 
 
 

NO.43 An infrastructure with 50 VMs has a power outage. After the VMware cluster has booted up again, 10 medium-sized VMs have corrupted VM disk files. Which action can be used to restore the VMs back to the production state?

 
 
 
 

NO.44 Which of the following objectives is achieved by adding additional proxy servers, in conjunction with parallel processing? (Choose two.)

 
 
 
 
 

NO.45 Which of the following Veeam products can estimate the required free space needed on target backup repositories?

 
 
 
 

NO.46 Which of the following jobs CANNOT utilize parallel processing?

 
 
 
 

NO.47 A company wants to leverage Veeam DataLabs to automate the creation of a test environment. As testing one large, multi-VM application could require more than a single host, a dedicated VMware ESXi cluster has been identified. The sandbox is to be refreshed weekly or on demand. Select the benefits of using replication jobs in this environment. (Choose two.)

 
 
 
 
 

NO.48 Which of the following Veeam Backup & Replication jobs can be set up to support GFS retention?
(Choose two.)

 
 
 
 
 

NO.49 A company has replicated their critical application VMs to a second data center in another region.
Their key application includes two database VMs and three application VMs. For proper operation, the database VMs need to start before the application VMs. What needs to be configured in Veeam to prepare for a disaster recovery situation?

 
 
 
 

NO.50 A physical Linux server protected by a centrally managed Veeam agent is physically damaged. A VMware vSphere infrastructure is available, and the physical server is eligible for virtualization. Which recovery step provides the lowest possible RTO?

 
 
 
 

NO.51 Which of the following jobs can use a Scale-Out Backup Repository as a target? (Choose two appropriate options)

 
 
 
 
 

NO.52 Which of the following statements are true about Veeam Backup Repositories?
(Choose two.)

 
 
 
 
 

NO.53 What is the main purpose of the planned failover feature?

 
 
 
 

NO.54 Which of the following statements are true when comparing a synthetic full backup to an active full backup, on a NTFS-based Backup Repository? (Choose two.)

 
 
 
 
 

NO.55 Which procedure is an option to finalize replica failback?

 
 
 
 
 

VMCE2021 Exam Dumps, VMCE2021 Practice Test Questions: https://www.real4prep.com/VMCE2021-exam.html

         

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt www.zazzle.com

Schreibe einen Kommentar

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Geben Sie den Text aus dem Bild unten ein